Relief Device Study as per OSHA guidelines for Valero refineries at Texas City, Aruba, Mckee & Paulsboro |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing, Flare network building and its analysis, Mitigation of all concerns of Relief system device. |
Relief Device Study as per OSHA guidelines for ConocoPhillips refineries at Borger, Ferndale, Los Angeles & Santa Maria, Trainer |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing, Mitigation of all concerns of Relief system device. |
Relief Device Study as per OSHA guidelines for Marathon refineries at Canton, Texas City, Garyville, Detroit, St Paul, Michigan and Robinson |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing, Flare network building and its analysis, Revalidation of the study, Mitigation of all concerns of Relief system device. |
Relief Device Study as per OSHA guidelines for Exxon refineries at Beaumont, Falwey, Joliet,Singapore |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. Flare network building and its analysis. AIV Study |
Relief Device Study as per OSHA guidelines for Sunoco refineries at Eagle Point, Neal, Toledo, Tulsa, RasTanura |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing, Flare network building and its analysis, Mitigation of all concerns of Relief system device, HIPPS Study. |
Relief Device Study as per OSHA guidelines for Frontier refinery at El Dorado Crude section |
PSV Study after Revamping |
Relief Device Study as per OSHA guidelines for Shell Dear Park (Singapore) |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for Chevron Pascagoula refinery |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for Suncor refineries |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for Koch Industries |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for Saudi Aramco refineries at KSA |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for Exxon Mobil Chemical (Singapore) |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing |
Relief Device Study as per OSHA guidelines for Sinclair |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for Petronas refineries Malaysia |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing, Flare network building and its analysis. |
Relief Device Study as per OSHA guidelines for Hess Corp |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for Tessenderlo, Belgium |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for NARL, Canada |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing, Mitigation of all concerns of Relief system device. |
Relief Device Study as per OSHA guidelines for Flint Hill |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing |
Relief Device Study as per OSHA guidelines for TCO Kazakistan |
Mitigation of all concerns of Relief system device. |
Relief Device Study as per OSHA guidelines for Sasol Alcohol |
Mitigation of all concerns of Relief system device. |
Relief Device Study as per OSHA guidelines for FMC bayport |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. Mitigation of all concerns of Relief system device |
Relief Device Study as per OSHA guidelines for Westlake Vinyl |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for SABIC KEMYA |
Mitigation of all concerns of Relief system device. |
Relief Device Study as per OSHA guidelines for Tesoro |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. |
Relief Device Study as per OSHA guidelines for BP Carson |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing |
Relief Device Study as per OSHA guidelines for HPCL Visak |
Revalidation of the study |
Relief Valve design verficiation for the expanded facility for Westlake Vinyls, Calvert City, USA |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. Mitigation of all concerns of Relief system device |
Relief Valve design verficiation for the expanded facility for Westlake Vinyls, LP Geismer, Louisana, USA |
Overpressure scenario identification, Relief device sizing, Required relief rate calculation, Identification of global scenarios and its sizing. Mitigation of all concerns of Relief system device |
Flare header network study for ethylene unit at calvert city for Westlake Vinyls, USA |
Flare network model, adequacy check and sizing of flare header network for expansion case, identification of global overpressure scenarios, evaluation of vapor disposal system performance, flare tip analysis, knockout drum adequay, |
Sizing of the emergency vent nozzle of reactors and vessels on which safety relief devices (rupture discs and pressure safety valve are installed) for Lubrizol India Private Limited |
calculation/design basis for the given estimation, verification of rupture discs already installed on existing emergency vents, Compilation of report that included all input data, assumption, process parameters etc taken into consideration for the adequacy check, summary of the calculations and final outcome. |